After moving production to a new facility in Cheshire, Myprotein found they had a need to feed product from above into various mixing vessels and Doity Engineering Ltd were asked to specify a clean area for the goods.
The installation features a fully powder coated handrail and staircase system along with aluminium decking laid over the traditional 38mm chipboard to give a durable and clean surface.