In May 2021 General All Purposes Plastics, perhaps better known as “GAP” began a project to expand their head office in Blackburn and part of this plan was to install a mezzanine floor to create additional office space.
Doity Engineering were approached to provide a design a cost for the works which was accepted and completed in good time to the customers satisfaction.
At the same time GAP were also in the process of opening trade outlets for plastic building components across the country and nominated Doity Engineering as their preferred contractor to supply Revlok mezzanine floors in the new buildings.
Several depots have now been fitted out around the country and are full operational to provide customers with the latest in plastic profiles and each contains a Revlok mezzanine floor from Doity Engineering.
‘Doity Engineering have worked with GAP to design and build a mezzanine that accommodates our bespoke racking system. The results have led to us maximising both the space and functionality of our latest depots. As GAP continues to grow we look forward to working closely with Doity on our upcoming projects’ - James Kenyon Estate Surveyor General All Purpose Plastics