BAUER KOMPRESSOREN LIMITED

Project Description

Project Info

REQUIREMENTS: CONSTRUCTION OF A REVLOK MEZZANINE FLOOR WITH ONE HOUR FIRE PROTECTION - PROVIDE APPROXIMATELY 125 SQUARE METERS OF ADDITIONAL FLOOR SPACE TO ALLOW SEPARATION OF CUSTOMERS STOCK HOLDING.

Project Location

Saint Helens


Project Type

Revlok Mezzanine Floor


More Information
Supply and install a 25m x 5m RevlokTM mezzanine floor with one part K compliant staircase, handrail and pallet load gates. Span over existing ground floor welfare facilities and provide the required one-hour fire protection to the structure. Undertake all electrical works, standard and emergency lighting and smoke detection to the underside. Bauer Kompressoren are one of the world's premier compressor manufacturers and are a worldwide group, we fitted the mezzanine floor at their Haydock facility to give separation of different clients product within the building. The brief specification was a 22m x 5m mezzanine floor with one access stair and two up and over pallet gates spanning the existing ground floor facilities. We fitted Full one hour fire protection - suspended ceiling and column casings and we also took control of the electrical installation and Building Regulations application meaning only one main contractor on site. The final floor finish is a vinyl covering. "We are very happy with the newly installed mezzanine which provides us additional floor space at a realistic price. From initial order through to completion Doity have made the process easy. The installation was carried out with no disruption to our production area. The work was carried out to a high standard and completed on schedule" Steve